For illustration, a distributor ships only two pump seal kits in a quarter and plans to hold just two. Service records tell a different story. Several pumps waited for the part, and one owner bought another pump rather than wait. Separate repair requests from shipments before setting stock. During a stockout, shipments cannot exceed available stock. Forecasting only from them can perpetuate the shortage.
Count repair events rather than follow-up calls
For each confirmed request, keep the service ticket, equipment version, part and quantity, required date and outcome. Outcomes might include original part sent, approved substitute accepted, waiting, replacement pump used, cancelled or confirmed no part required. A customer who calls twice or a branch and workshop opening tickets for the same job should not create multiple demands. Keep unidentified enquiries and mismatches apart. Separate usable, reserved and quarantined inventory. The warehouse may show units on hand that the repair desk cannot issue.
Some customers leave without placing a ticket during a stockout. A ledger cannot recover every such request. Ask branches to record identifiable requests they actually receive and acknowledge the remaining uncertainty. Treat those observations as evidence for a buying decision, rather than inventing missed sales or declaring that every cancelled enquiry would have become an order.
Look at the next replenishment interval
In an illustrative quarter, eight distinct confirmed jobs request one kit each. Two originals ship and one job is completed with an approved substitute. Three are waiting and two cancel because of lead time. Recorded demand is eight and original shipments are two. It does not follow that the next order must be eight. Check whether substitute supply is dependable, how many open jobs still need filling, how many requests could arrive during replenishment and which customers can wait. Seasonal service and a group of pumps installed together can produce a short peak that a quarterly average hides.
After stock arrives, verify which backlog tickets close and track subsequent new requests separately. Shipping old orders now does not make them new demand. Keep whole-pump replacement, repair spares and end-of-life buys as separate decisions. When lead time is unstable or minimum buys are large, consider modest stocked cover, another approved source or scheduled consolidation. Choose according to the service wait that can be accepted. Review the result after a replenishment cycle before increasing the holding target again.
For each part and applicable equipment revision, show backlog, usable stock, expected receipt date and approved substitutes. If the number has changed revision, do not combine historical shipments into one interchangeable pool without checking which build the new stock can service. After receipt, review how long valid jobs took to complete. That can distinguish a low purchase quantity from late freight. If most waiting occurs while a repair is awaiting approval, more stock may not improve response. Keep warranty, paid repair and goodwill codes separate for service reporting, while combining the physical purchasing need where appropriate and avoiding duplicate demand. Make the counting rules work before adopting a more complex intermittent-demand model. In a sparse series, one duplicated or omitted ticket can matter more than the choice between forecasting formulas. Keep the first review small and observable, then adjust stock from the completed replenishment interval.
For transfers between branches, keep the original service ticket attached to the movement. A transfer changes stock location; it does not create another repair. Otherwise both branches may reorder for the same job and the network forecast will count demand twice. Reconcile those movements before deciding on another purchase.
Frequently asked questions
Does an approved substitute still count toward the original demand?
Record the original repair need and its substitute outcome. Do not count an additional new repair just because another part number shipped.
Should every cancelled ticket count?
Check that the request was valid for the part. Record cancellations caused by waiting separately from misdiagnosis or a job that no longer needed the part.
How should we start with very little history?
Use the known installed variants, verifiable requests and supplier lead time for a small first decision. Review soon; zero observed sales do not establish zero risk.