In a typical basement job, a hose climbs through a window, crosses a yard and drops to an open drain. It helps to mark two heights on the sketch. The high point tells you what the pump must overcome while the route fills. The outlet elevation helps set the head once a continuous water column is established.
Draw the route from the water surface
The pump adds energy to the water. Elevation between source water surface and effective discharge level sets the static part. Hose wall friction, elbows, reducers and check valves add flow-dependent loss. The highest physical point matters for priming and siphon behaviour, while the final level matters for steady energy balance.
For free discharge, measure elevations from the surface being pumped to the point where water leaves the hose. Work from the lowest safe pumping level as well as the starting level. A hose that ends underwater has a different boundary condition. The receiving water level matters, and the routing can also let water flow in a direction you did not intend.
The crest is particularly important when there is air in an empty hose. A low final outlet can help an established siphon, but folds, a leak or a vent can change the way the water column forms or breaks. Size and test the route so it works during startup with normal air in the line. Use a discharge arrangement allowed for the site and pump, with no reliance on an unverified siphon.
Add friction at the flow you need
Sketch source level, highest point, final outlet and every hose section. Measure hose bore and length, then identify the required emptying time. Use the model curve to find flow at the calculated system head and verify the installed result with timed volume.
For example, 1.8 m static lift plus an estimated 2.2 m of route loss at the target flow gives about 4 m total head for comparison. It does not mean every hose produces 2.2 m loss.
If the goal is to remove 600 litres within 30 minutes, the arithmetic starting point is 20 L/min, before accounting for any water entering during the job. At that flow, estimate the losses for the hose length and bore, bends and adapters. Read the pump curve around the resulting total. An advertised maximum flow near zero head gives no direct answer for a narrow hose over the sill.
As the water falls, the route gains static head to a fixed outlet and may lose delivery. If the basement is still taking water, a level that stops falling can mean incoming and outgoing flow have become similar. For an ongoing inflow the pump must first keep up with that water, then provide a surplus to bring the level down.
Check startup and the discharge location
Choose a pump whose supported curve covers the required flow with margin for the documented route, and place the outlet where discharged water cannot return toward the building.
Fasten the hose where it passes over the sill so it cannot close into a sharp fold. Set the outlet where runoff will leave the building area and confirm the local drainage arrangement. A hose that ends close to the foundation can send the same water back into the basement. Measure output where it can be collected safely, then inspect the direction of any drainback after shutdown.
Flood water near live electrical equipment is a separate hazard. Have the area and supply made safe before entering or testing equipment. Check with the building owner or a qualified professional before rapid drawdown where flooding or groundwater could have affected the structure.
Frequently asked questions
Is the highest point the total head?
It is central to startup. For steady free discharge in a filled route, use the final outlet elevation and add losses at the desired flow. Check the crest and the steady duty separately.
Can a longer hose make a pump with enough lift work poorly?
Yes. At the same flow, losses rise with hose length and restrictions. Find the flow at the added head or measure delivery through the final layout.
What should an installer write on the selection sheet?
Include the lowest pumping level, crest, outlet level, hose bore and length, estimated or measured flow and the required emptying time. Record where discharge can safely go.